BOQ preparation services

Complete, accurate Bills of Quantities prepared remotely by graduate quantity surveyors — measured to the standard you specify and delivered in your format.

Office building with a stone grid facade and planters

Overview

A Bill of Quantities (BoQ) turns drawings and specifications into a priced list of every item of work. It is the basis for tendering, comparing bids, valuing work and managing change — so errors in the BoQ become errors in the contract.

We prepare complete BoQs from your drawings, specifications and BoQ format guidelines. Every quantity is traceable to a take-off sheet, and every description follows the standard method of measurement your project uses.

Deliverables

  1. 01

    Complete Bills of Quantities

    Preliminaries, measured work and provisional sums, organised by trade or element to suit your project.

  2. 02

    Your standard of measurement

    Measured to NRM 2, POMI, SMM7, QSMM, CESMM 3/4 or SLS 573 — whichever your contract specifies.

  3. 03

    Every discipline

    Architectural, structural, M&E and plumbing, infrastructure, landscape, irrigation, ICT, security systems and data centres.

  4. 04

    Your format

    Editable Excel and PDF, in our layout or your own template, ready to issue for tender.

  5. 05

    Take-off sheets and marked-up drawings

    Supporting calculations so your team can check and update any quantity.

  6. 06

    Quality assurance

    A second quantity surveyor checks quantities, descriptions and units before delivery.

  7. 07

    Revisions after design changes

    Updated BoQs with changes highlighted and a comparison report of what moved.

Developers and consultants use BoQs to tender main contracts and compare bids on a like-for-like basis. Contractors use them to price tenders and to prepare subcontract packages. During construction, the same BoQ is used to value interim payments and variations.

  • Main contract tenders and re-tenders
  • Subcontract and package BoQs for contractors
  • Pre-tender estimates and budget checks
  • BoQs for bank loans and project finance

Across the GCC, BoQs are commonly measured to POMI or NRM 2, while civil engineering work often follows CESMM. In the UK, NRM 2 has replaced SMM7 for building works, and in Sri Lanka SLS 573 is widely used. We follow the standard named in your tender documents, or recommend one if it is open.

How we work

  1. 01

    Send your drawings

    Share PDF, DWG or Revit files with the specifications, and tell us the measurement standard and BoQ format you need.

  2. 02

    Scope, timeline and quote

    We confirm exactly what is included, the deliverables and a delivery date before any work starts.

  3. 03

    Measure and check

    Graduate quantity surveyors measure the work, then a second surveyor checks quantities and descriptions against the drawings.

  4. 04

    Deliver and support

    You receive editable Excel and PDF files, take-off sheets and marked-up drawings, and we answer queries and revisions.

Standards: NRM 01 · NRM 02 · SMM 7 · QSMM · POMI · CESMM 3 · CESMM 4 · SLS 573

FAQ

What do you need to prepare a BoQ?

Drawings (PDF, DWG or Revit), the specifications and, if you have one, your BoQ template. Tell us the standard of measurement and the deadline, and we confirm scope and delivery date in our quote.

How long does BoQ preparation take?

It depends on the size of the project and how complete the drawings are. We agree a delivery date before we start and can phase delivery by trade or by package if you need early sections.

Can you price the BoQ?

Yes. We can add rates you provide, rates from recent tenders or market rates that we agree with you, so the BoQ becomes a pre-tender estimate.

Do you update the BoQ when the design changes?

Yes. We revise the BoQ to the new drawings, highlight every change and provide a comparison report showing the items and pages that moved.

Start a conversation

Let’s measure your next project.

Share your drawings and we will come back with a scope, timeline and quote.